Cornerstone Logistics Hub

Cornerstone Logistics Hub — 3-phase industrial campus

A 1.9M sq ft logistics campus constructed in three parallel stages to align with the occupancy of tenants in the Inland Empire. — Riverside, CA, 2022.

1.9M

sq ft delivered

3

Phases concurrent

24

Energy reduction

$0

Liquidated damages

The challenge

The logical decision to operate three construction stages at the same time, with tenants moving into Phase 1 ahead of Phase 2 topping out, was made in one of the busiest logistics routes in the country.

Timely Delivery
Live occupation

Phase 1 tenants operational while Phase 2 was mid-tilt-up.

Timely Delivery
Heavy logistics

Five hundred ton crane picks monitored on-dock activity.

Timely Delivery
Power continuity

Constant supply of utility services throughout the construction process.

mission

Our approach

There was a special Phase Interface Manager who communicated all activities across zones. Operation tenants were shielded by noise and vibration barriers. The simulation of crane scheduling was completed 4 weeks ahead based on the 4D sequencing software attached to the live project timeline.

The outcome

None of the three phases experienced a tenant disruption incidence. Energy modeling provided 24 percent reduction over the baseline and the project was completed without liquidated damages. Achieved LEED Silver.

“The concurrent phasing could have been a nightmare. Houseura made it look easy.”

— Ryan Torres, VP Facilities — Cornerstone Industrial